As a transmission system operator, TransnetBW GmbH is responsible for the safe and stable operation of its grid. The condition for this is that the balance between production and use is maintained in the TransnetBW control area. In order to ensure this, TransnetBW GmbH needs control power and control energy. The products necessary for the TransnetBW control area are tendered by TransnetBW GmbH.
According to the new regulations of the second Energy Industry Act and the Network Charges Ordinance, the control reserve is tendered and allocated jointly by the German transmission system operators (TSOs). Further information is available on the shared website of the German TSOs.
Tender for Primary and Secondary Control
As of December 1, 2007, the tender for primary and secondary control will be made as joint tenders with the other German transmission system operators.
- Primary Control regelleistung.net
- Secondary Control regelleistung.net
- Minutes Reserve regelleistung.net
Prequalification
The joint prequalification requirements of the four German transmission system operators are available in “TransmissionCode 2007”, which is published at www.regelleistung.net. At this website, you will also find further information as well as all prequalification documents and a sample form for download.
- Specific Prequalification Requirements TransnetBW PDF/625KB/DE
- General Prequalification Requirements regelleistung.net
List of prequalification documents for Primary Control
- Annex D1 of Transmission Code 2003 (PC)
- Example contract for Primary Control
- Example printout verification for Primary Control
- TransnetBW specific prequalification documents (if necessary)
List of prequalification documents for Secondary Control
- Prequalification requirements for Secondary Control / Implementation of SC-Poolmodel
- Example contract for Secondary Control
- Example printout verification for Secondary Control
- Confirmation of provider prequalification
- FAQ for Confirmation of provider prequalification
- TransnetBW specific prequalification requirements (if necessary)
List of prequalification documents for Minutes Reserve
- Annex D3 of Transmission Code 2007 (MR)
- Example contract for Minutes Reserve
- Example printout verification for Minutes Reserve
- Confirmation of provider prequalification
- FAQ for Confirmation of provider prequalification
- TransnetBW specific prequalification requirements (if necessary)
Exclusion of liability
All data is determined by TransnetBW to the best of its ability and is provided without guarantee. If it is temporarily not possible, for technical or other reasons, to determine the data or make it available, TransnetBW shall endeavour to restore data availability without delay. As far as it is legally permitted, TransnetBW excludes liability for damages due to the temporary unavailability of data. TransnetBW reserves the right to update all data published here.